SWPPP Documents

Federal forms, state permit portals, plan templates, and inspection logs — everything you need for stormwater compliance in one place.

Federal Forms & Permits

EPA Construction General Permit (CGP)External

The baseline federal permit for stormwater discharges from construction activity. Required for sites disturbing 1+ acres.

Visit Portal
Notice of Intent (NOI) — EPA eNOI SystemExternal

Submit your NOI electronically through the EPA's NPDES eReporting system to obtain coverage under the CGP.

Visit Portal
Notice of Termination (NOT)External

Required when construction is complete and the site has achieved final stabilization. File to terminate CGP permit coverage.

Visit Portal

SWPPP Plan Components

Site Map Requirements ChecklistContact Us

Complete checklist of what must appear on your SWPPP site map: drainage patterns, BMP locations, impervious surfaces, and discharge points.

Get This With Your SWPPP →
BMP Selection GuideContact Us

Best Management Practice selection matrix — match your site conditions to the correct erosion and sediment controls.

Get This With Your SWPPP →
SWPPP Inspection Log TemplateContact Us

Standardized inspection log for documenting required stormwater inspections throughout the construction period.

Get This With Your SWPPP →
Corrective Action LogContact Us

Document BMPs that need repair or replacement and track corrective actions to maintain permit compliance.

Get This With Your SWPPP →

State Regulatory Agencies

Texas — TCEQ (TXR150000 Permit)External

Texas Commission on Environmental Quality — Construction General Permit and NOI portal for Texas projects.

Visit Portal
California — SWRCB SMARTS PortalExternal

California State Water Resources Control Board — Stormwater Multiple Application and Report Tracking System for CA permits.

Visit Portal
Florida — FDEP Business PortalExternal

Florida DEP online portal for stormwater permit applications, NOI submissions, and permit management.

Visit Portal
Nevada — NDEP NPDES ProgramExternal

Nevada Division of Environmental Protection — stormwater permit applications and construction general permit information.

Visit Portal
Arizona — ADEQ Permit PortalExternal

Arizona Department of Environmental Quality — construction stormwater general permit (AZPDES CGP) and NOI filing.

Visit Portal
Colorado — CDPHE NPDES PortalExternal

Colorado Department of Public Health and Environment — stormwater permit program and construction permit applications.

Visit Portal
Georgia — EPD NPDES ProgramExternal

Georgia Environmental Protection Division — land disturbance activity permits and NPDES stormwater general permits.

Visit Portal

Ready to Get Compliant?

Order your SWPPP today and receive it in 72 hours — guaranteed.

72-Hour Delivery — or it's FREE

If we don't deliver your completed SWPPP within 72 hours of receiving your civil drawings, you pay nothing.

Call Now